dc.contributor.author | Quah, Chee Hean | |
dc.date.accessioned | 2014-11-03T05:03:41Z | |
dc.date.available | 2014-11-03T05:03:41Z | |
dc.date.issued | 2011-05 | |
dc.identifier.uri | http://dspace.unimap.edu.my:80/xmlui/handle/123456789/37585 | |
dc.description | Access is limited to UniMAP community. | en_US |
dc.description.abstract | This project studies a method that Artificial Bees Colony (ABC) algorithm in solving the Economic Dispatch Problem (ED) with transmission losses by minimizes fuel cost and also controls the generator limit. ED problem pertains to be optimum generation scheduling of available generators in power system to minimize the cost of generation
subject to systems constraint. ABC is developed based on inspecting the behaviors of real bees on finding nectar and sharing the information of food sources to the bees in the hive. In this project 5 bus and 9 bus system are used. In order to success this project, study on the behaviour of ABC and ED problem is important. MATLAB was used to developing this project. From the simulation, shows that ABC is better compared to conventional methods. | en_US |
dc.language.iso | en | en_US |
dc.publisher | Universiti Malaysia Perlis (UniMAP) | en_US |
dc.subject | Artificial Bee Colony (ABC) algorithm | en_US |
dc.subject | Economic Dispatch Problem (ED) | en_US |
dc.subject | Transmission losses | en_US |
dc.title | Artificial Bees Colony (ABC) algoritm technique in Economic Dispatch (ED) problem | en_US |
dc.type | Learning Object | en_US |
dc.contributor.advisor | Mohd. Herwan Sulaiman | en_US |
dc.publisher.department | School of Electrical Systems Engineering | en_US |