Show simple item record

dc.contributor.authorAhmad Makail, Ahmad Nadzri
dc.contributorSchool of Environmental Engineeringen_US
dc.date2023-08
dc.date.accessioned2025-03-29T02:10:38Z
dc.date.available2025-03-29T02:10:38Z
dc.date.issued2016-06
dc.identifier.urihttp://dspace.unimap.edu.my:80/xmlui/handle/123456789/83217
dc.descriptionAccess is limited to UniMAP community.en_US
dc.description.abstractThe study is about the Industrialised Building System (IBS), The Implementation Barriers of PM2 Advance Building System. The study is made to determine the hindrance occurred using the IBS technique of PM2 panel. The objectives of the research are to study the level of awareness of usage of PM2 panel among the players in the construction project, to assess the problems arise in the usage and the implementation PM2 panel system and to give suggestion and recommendation to improve the PM2 panel system. The variables for this study are the knowledge among the project personnel, skills of local and foreign labourers, component supplier and the guidelines and building codes. Thirty respondents are sampled for this research. The method chosen for this research is survey. The survey is carried out by two ways including interviews and distribution of questionnaire among the targeted respondents. About twenty seven respondents have answered the questionnaire given in the survey conducted. The respondents are among the staff of the company involve in the construction in Perlis. They are from varies background which includes engineer, assistant engineer, quantity surveyor, technician, project manager, support staff and many more. The questionnaire answered are analyse using International Business Machines Statistical Package for the Social Sciences (IBM SPSS) version 23. The result shown that the main barriers to implement PM2 panel are basic knowledge of IBS, the cost and time of construction.en_US
dc.language.isoenen_US
dc.publisherUniversiti Malaysia Perlis (UniMAP)en_US
dc.subject.otherPM2 Advance Building Systemen_US
dc.subject.otherIndustrialised Building System (IBS)en_US
dc.subject.otherPM2en_US
dc.titleThe study of industrialised building system, the implementation barriers of PM2 advance building system.en_US
dc.typeOtheren_US
dc.contributor.advisorUmar Hj Kassim, Dr.


Files in this item

Thumbnail
Thumbnail
Thumbnail
Thumbnail
Thumbnail
Thumbnail
Thumbnail

This item appears in the following Collection(s)

Show simple item record