• Login
    View Item 
    •   DSpace Home
    • Final Year Project Papers & Reports
    • School of Environmental Engineering (FYP)
    • View Item
    •   DSpace Home
    • Final Year Project Papers & Reports
    • School of Environmental Engineering (FYP)
    • View Item
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Conflict and problem arise among architect, consultant and contractor during design and construction stage

    No Thumbnail [100%x80]
    View/Open
    Abstract, Acknowledgement.pdf (799.7Kb)
    Introduction.pdf (694.1Kb)
    Literature Review.pdf (791.0Kb)
    Methodology.pdf (715.7Kb)
    Result and Discussion.pdf (820.1Kb)
    Conclusion and Recommendation.pdf (708.1Kb)
    Reference and Appendics.pdf (743.5Kb)
    Date
    2016-06
    Author
    Mohamad Hafizi, Marjuni
    Metadata
    Show full item record
    Abstract
    Building projects involve interaction among many different participants such as client /financier, consultants, architect, engineer, quantity surveyor, general contractor, subcontractors and material suppliers. Coordination of resources, time and communication entail full cooperation and collaboration between project participants. The success or failure of a project is inextricably linked with the conflicts that the project team encounters during the building project stages. Therefore, this study explores the causes and types of conflicts occur during design and construction stages among three main participants in building project which are contractors, architects and consultants and also proposed approaches on how to manage the conflicts. In order to identify the conflicts that always occur in a building project, set of questionnaire is prepared. In the questionnaire, there will be two main parts that respondent need to clarify, which are the (I) conflicts/ problem part and (II) solution part. The data from the questionnaire survey is analyzed by SPSS analysis. To deal with the arises conflicts, the study proposes strategies that could reduce effectively the occurrences of conflicts in building projects. The study find out that factors causing the conflicts are in various form. The factors are related to role function when parties fail to perform as expected. However, the study establish on how to manage the conflict arise during the design and construction stage. the study proposes the framework as a strategy that could reduce effectively the incident of conflicts in building project.
    URI
    http://dspace.unimap.edu.my:80/xmlui/handle/123456789/83323
    Collections
    • School of Environmental Engineering (FYP) [638]

    Atmire NV

    Perpustakaan Tuanku Syed Faizuddin Putra (PTSFP) | Send Feedback
     

     

    Browse

    All of UniMAP Library Digital RepositoryCommunities & CollectionsBy Issue DateAuthorsTitlesSubjectsThis CollectionBy Issue DateAuthorsTitlesSubjects

    My Account

    LoginRegister

    Statistics

    View Usage Statistics

    Atmire NV

    Perpustakaan Tuanku Syed Faizuddin Putra (PTSFP) | Send Feedback
     

     

    NoThumbnail